Get a professional assessment for your facility today.
Crack Repair
Cracks in walls, floors, or foundations are more than just aesthetic issues; they can be early warning signs of structural stress. Sigma FM provides specialized crack injection and repair solutions using advanced materials to restore the structural integrity and appearance of your property, preventing further deterioration.
What we offer:
- Structural Crack Injection: Utilizing high-pressure epoxy or polyurethane injection to seal deep structural cracks.
- Cosmetic Wall Repair: Professional filling and finishing of non-structural hairline cracks to restore a flawless surface.
- Foundation Stabilization: Addressing the root cause of settlement cracks to prevent future movement.
- Expansion Joint Maintenance: Repairing and resealing joints to allow for natural building movement without cracking.
- Concrete Carbonation Treatment: Protecting reinforced concrete from corrosion caused by moisture entering through cracks.
Service Excellence Standards:
Root Cause Analysis
We don't just cover the crack; we analyze its pattern and depth to determine if it’s structural or cosmetic before recommending a solution.
High-Performance Materials
We use industrial-grade epoxies and specialized mortars specifically designed to withstand the high temperatures and humidity of the UAE.
Seamless Integration
Our repair process includes professional finishing and color matching, ensuring the repaired area blends perfectly with the existing structure.
FAQ:
How do I know if a crack is dangerous?
Generally, horizontal cracks, cracks wider than 5mm, or those that appear suddenly are signs of structural stress and should be inspected by our engineers immediately.
Will the cracks appear again after repair?
By identifying the cause (like settlement or thermal expansion) and using flexible or high-strength fillers accordingly, we ensure long-lasting results that prevent recurrence.
How long does the repair process take?
Minor cosmetic repairs can be finished in a few hours, while structural injection might take 1-2 days depending on the severity and accessibility of the area.
- Detailed Inspection & Diagnostic Report.
- Final Surface Finishing and Painting.